The detail drawings are grouped by detail type and can be downloaded below in dwg or pdf format.
Epdm flat roof edge details.
For corner details cut the top edge and also a v shape in the trough at the bottom edge of the trim.
Allow the epdm field membrane to pass over the edge by minimum 100 mm and fully adhere it to the front of the wood nailer over its full length.
An excess of membrane at the gutter edge corners needs to be tidied up and secured.
This excess can be folded around and glued or attached to the side of the roof edge with a hammer tacker.
Firestone has developed cad drawings of its epdm installation details to assist roofing professionals with the specification of firestone epdm roofing systems.
Hold your cursor over the file name to view when a drawing was last updated.
Use the tin snips to cut the trims to size.
Install a wood nailer at the roof edge.
Use stainless steel screws to fasten the metal edge profile to the wood nailer at 100 mm on centre.